Sunday 16 September 2012

Weekend finished .......


Buoyed with enthusiasm after a successful if rough engine run, we pressed on with the front end and jobs still to do. The front sides were secured to the chassis with large headed rivets to the underside only issue was making sure I knew where the chassis was and was not drilling into fresh air !
Joe was wrapping up the front end by fitting the repeaters to the wings and neatening wiring and other routings. The small repeaters are great compared to the larger ones originally supplied. We fitted 2 pin gold plugs to the repeaters making sure we could if needed remove the whole wings in one piece, hopefully we will never need to ! We corrected a fuel leak from the rear hose where it joined the metal pipe, the jubilee clip was seated incorrectly and it was a straightforward fix which seems ok now.


Wing with repeater fitted
Protected wire and Sikaflex adhesive
Heat shrinking insulation on Deans plugs
Tidy wires and brakes
More LED's yay !!
6 hours today 219 hours total we reckon about 80% there now !

No comments:

Post a Comment