As we do not have an engine ECU harness or an engine come to that we started on tidying the loom for the rear of the car and concentrated our efforts here. The fuel pump and inertia switch were fitted together with the handbrake and warning switch and cables. The loom was carefully secured protecting where necessary and is hopefully clear of the suspension without problem. Wish we had the shocks as we could see wheels on the wagon ! Last job this afternoon was to fill the diff with oil before other things made access too difficult. 61 Hours into the build.
|
Fuel Pump and wiring |
|
Inertia switch and loom |
|
Handbrake top view |
The build manual referred to a warning switch seemingly already fitted to the handbrake, after a search the switch was located and after a bit of head scratching was easily fitted into place !
|
Handbrake and warning switch |
Here is the finished replacement rear hub stud which actually fits !
No comments:
Post a Comment